WOOD WHARF PLOT B3

Construction of a 14 floor core constructed with Peri RCS system, 10 story RC frame coming of existing ground floor slab and installation of 4no floors metal decking topped with concrete. The frame consists of a suspended swimming pool at level 3 formed with PUDLO concrete, a transfer slab at level 5 and coordination of cast-in channels for the follow on cladding contractor.

Package also include the installation of precast stairs along the supply of a tower crane.

YEAR

2019

LOCATION

WOOD WHARF

CLIENT

CWG (Wood Wharf Two) Limited

ARCHITECT

Allies and Morrison

CONTRACTOR

GCL (Ground Construction Limited)

CONSULTANT ENGINEER

Thornton Tomasetti

PROJECT VALUE

£6M